OPDEC’s Critical Path Tool  
OPDEC’s Task Review Tool  
 

OPDEC, Inc. has released new versions of two tools from it’s suite of program management software. These products, OPDEC’s Critical Path and OPDEC’s Task Review, work in conjunction with Microsoft Project and KIDASA Software's Milestones Professional.

Both of these tools perform critical analysis and reporting functions and require a minimum of time and effort. The primary benefits delivered by these products are the tremendous time savings, the accuracy of the automated analysis delivered, and the briefing level quality of the reports generated by the tools.

Additional information is provided below about the capabilities of each of these tools, benefits, requirements and pricing. More information and a free limited use download of each tool can be found at www.opdec.com.

  

OPDEC’s Critical Path Tool

A Critical Path can be defined as: “The longest duration of a set series of activities to a milestone (event) will produce the critical path”.

The task of determining the critical path for a project milestone is normally very time consuming and difficult.  In addition to determining critical path for a milestone it is essential to identify and document the problems that underlie any conflicts.  Modified completion dates and other changes in the schedule activities are constantly impacting the critical path. The more dynamic and complex a project schedule becomes the more imperative it is that the critical path is identified accurately and frequently. The problem is heightened because under these conditions of changing and complicated schedules the critical path becomes more difficult to determine. As updating the critical path becomes more neglected and less visible to focus corrective actions on project problem areas, the more out of control the project schedules become.

Determining the critical path in any project can now be accomplished instantly and accurately by using OPDEC’s Critical Path Tool.  The OPDEC Critical Path tool is an add-on to Microsoft Project that displays a graphic representation of up to 5 critical paths and their associated integration points. It provides a quick analysis of the critical paths to Major Milestones in the Integrated Master Schedule (IMS). 

 
 
   

Example:

(Critical Paths 1-5 to Selloff Unit 5”), displays the top 5 critical paths to the Milestone. The legend, (Path 1, Path 2, etc.), shows the float (slack) for each path. The user is now equipped with the required reference points to enable quick analysis of the IMS mapping network.

The chart can now be modified or copied to Microsoft Office Word or PowerPoint for presentation

 

Hyperlinks can be selected from each symbol to show further detail for that path.

The selection of that target milestone hyperlink will bring you to a page detailing the top issue

 
Example of Master Description Chart  
   
   
Example of Detail Description Chart  
 
 
More information and download at : http://www.opdec.com/msp_critical_path.html
 
OPDEC’s Task Review Tool
 

The Task Review tool is reporting tool that generates easy to read management reports depicting "Slipped" and/or "Look-ahead" activities, tasks that are at risk, and interfaces (hand-offs).Reports are widely customizable allowing you to tailor to your own company or program. Use the default report templates provided, or create an endless number of reporting styles driven to meet your needs. Task Review also allows for quick and easy creation of Microsoft PowerPoint Presentations based on the reports created.

 

With a one-time setup capability, you will be creating meaningful management reports grouped by any organizational type you please.

The Task Review Tool display’s data from Microsoft Office Project by utilizing Milestones Professional templates. Default templates are provided for each of the report types available in the Task Review Tool. These templates can be configured to display and report various types of information. Some of the more common attributes that are manipulated via the template are as follows:

  • Text sizes and placement
  • Graphical indicators
  • Symbol manipulation (for Gantt charts)
  • Introduction of company and/or program logos
  • Legend entries
  • Row shading
  • Much, Much, More
 

Using the selection criteria, the following reports are generated.

Task Review produces the reports in the following areas that you will want to know about:
  • Slipped Activities - Identify activities that have exceeded the planned date and may cause a delay in another activity in meeting its milestone date.
  • Look Ahead - Gain insight into the activities scheduled to start or complete. Couple this report with the Slipped Activities report into one if desired.
  • Tasks at Risk - Show activities whose % Complete variance exceed the threshold you define.
  • Interfaces - Show near term hand-offs from one IPT/Organization to another and how they affect each other.
  • Custom Output - Download the User's Guide to learn more about the great reporting features available with the Task Review Tool.

More information and download:  http://www.opdec.com/msp_task_review.html

  
Report Examples Using Default Templates

Slipped Activities Report

Slipped Activities are defined as those activities that have exceeded the planned date and may cause a delay in another activity in meeting its milestone date. Using the default Milestone Professional template ‘Slipped Activities.mtp’, the following report example was created.

The left-hand side of this report shows the activities that have passed their baseline as of the 11/16/2007 project status date. The Gantt chart is representative of the schedule dates as well as the baseline. In this template, the schedule dates are shown next to the schedule bars. On the right-hand side, the following custom fields are defined:

  • Core Issue
  • Status
  • Total Slack
  • Tasks at Risk
  • Related Event
   
Look Ahead Report

The Look Ahead report gives the user insight into the activities scheduled to start or complete up to the ‘Look to Date’ specified  Using the default Milestone Professional template ‘Look Ahead.mtp’, the following report example was created. 

The left-hand side of this report shows the activities that are scheduled to start/finish by 12/21/2007. The Gantt chart is representative of the schedule dates as well as the baseline. In this template, the schedule dates are shown next to the schedule bars. On the right-hand side, the following custom fields are defined:

  • Core Issues Status
  • Total Slack
  • Tasks at Risk
  • Period Variance
 
Tasks at Risk Report
The Tasks at Risk report is designed to show activities whose % Complete variance exceeds the threshold given. This variance is computed by subtracting the Activities’ % Complete from the CAM % Complete. Using the default Milestone Professional template ‘Task at Risk.mtp’, the following report example was created.

The left-hand side of this report shows the tasks that are considered at risk. The Gantt chart is representative of the schedule dates as well as the baseline. In this template, the schedule dates are shown next to the schedule bars. On the right-hand side, the following custom fields are defined:

  • Tasks at Risk
  • Period Variance
  • Related Event
   
Interfaces Report
The interface report is designed to show near term hand-offs from one IPT/Organization to another. Using the default Milestone Professional template ‘Interfaces.mtp’, the following report example was created.

The left-hand side of this report depicts the ‘From’ activity whose schedule finish date is on or before 12/31/2007. On the right-hand side is the ‘To’ or successor activity. The following custom fields are defined:

  • Line Type
  • Hand-Off Slack
  • Related Event

Additional Information

 Export Files to PowerPoint

Both tools have a utility that allows for the exporting of reports (or any Milestones Professional file) to a single MS Power Point slide.  Each page of a file will become a slide in MS Power Point.

 

  Requirements:

  • Microsoft Project 2003
  • Milestones Professional 2006/2008
  • Microsoft Windows XP

  Features and Benefits:

  • Integrates with Microsoft Office Project
  • Multiple Reporting Routines
  • Customizable Output using Templates
  • Exports to Microsoft Office PowerPoint

   Pricing:



 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 